I installed another power monitoring meter inline with the solar panels right by the controller so I could
get a better idea of power delivery than the solar controller's display will provide. I took quite a few
pictures of these displays during the test, starting shortly after start all the way to removing the two
batteries at the end. Maximum solar production was just over 300w, maximum battery charge current was 25a.



  01 just getting started  
  02 load connected  
  03 load is slowly depleating  
  04 load disconnected  
  05 25.1 amps peak charge  
  06 14a short increase in clouds  
  01 just getting started     02 load connected     03 load is slowly depleating     04 load disconnected     05 25.1 amps peak charge     06 14a short increase in clouds  
  07 19a overcast thinned  
  08 battery topped  
  09 battery now floating  
  10 battery unplugged  
  11 battery missing  
  07 19a overcast thinned     08 battery topped     09 battery now floating     10 battery unplugged     11 battery missing  