back to 100v 20a dual meter project

3 installing bezels and housings 3 installing bezels and housings:


Next I warmed up the hot glue gun and glued in the meter faceplates and PP30 powerpoles.

Not much to say here - just make sure the reset button holes are where you want them, and make sure to get the
powerpole connectors in straight and at whatever left/right orientation you prefer.



  1 meter faceplates hot glued  
  2 gluing PP30 jacks1  
  3 gluing PP30 jacks2  
  4 PP30 jack cooling1  
  5 PP30 jack cooling  
  6 inside before wiring  
  1 meter faceplates hot glued     2 gluing PP30 jacks1     3 gluing PP30 jacks2     4 PP30 jack cooling1     5 PP30 jack cooling     6 inside before wiring  


highest resolution images