back to constructing my own
4 falsted schematic testing
4 falsted schematic testing:
Revision C isolates battery and charge power, allows either to be loaded, adds 5v buck and fan, as well as
cleaning up the layout.

N0ZYC Electronic Load 2025.06.10.C (at Falstad)
last updated 06/10/2025 at 20:25:00 by make_www_index.command version 2025.05.20.B