DISORGANIZED: - a few helpers had difficulty finding the location - talk-in radio wasn't set up effectively FORGOT TO BRING: - trash bag - manuals for radios - check-in sheet - dedicated power cables for all for all radios WASN'T PREPARED FOR THE EVENT: - radios weren't set up for straight key - receive and transmit weren't tested - one demo code key was missing its return spring OTHER PROBLEMS WITH PREP: LACKED MANPOWER FOR: NOT ENOUGH TIME TO SET UP: HAD DIFFICULTY SETTING UP: OTHER PROBLEMS WITH SETUP: - solar frames were getting blown over by wind WISH WE HAD BROUGHT: POWER PROBLEMS: WEREN'T ABLE TO DO: OTHER PROBLEMS WITH OPERATIONS: TO-DO BEFORE NEXT EVENT: - fix 94 and add 97 to talk-in radio (and test scanning) - add lengths of paracord to solar deploy box for panel tie-down - split up heavier panels into two totes?