back to 2025.11.02 N8TWO tower installations

9 lessons learned 9 lessons learned:


- make sure brackets are fully and correctly assembled to avoid needing to make adjustments on the tower
  (the weather station needed to be turned to face north)

- keep weight down on bracket assemblies so they're easier to handle (APRS mast pole was steel, should have
  been aluminum)






last updated 11/03/2025 at 07:10:38 by make_www_index.command version 2025.06.28.A