back to 2025.10.01 K0DV rotor swap
1 roof inspection
1 roof inspection:
I did a quick inspection of the guy wires before climbing the tower.  One set did need a little tightening,
but the turnbuckle was already maxed, so the guy wire needed to be pulled in a little.  All the roof anchors
were solid.  The shingles also looked like they were getting near their replacement date.
  
    
      
          
      
     | 
    
      
          
      
     | 
    
      
          
      
     | 
    
      
          
      
     | 
    
      
          
      
     | 
    
      
          
      
     | 
  
  