back to 2023.11.18 Stan Huhman tower takedown

0 stan tower agenda 0 stan tower agenda:


Saturday 9AM

- prep gin pole, lift rope, and tag lines
- clean tower (hugely time-consuming)

- raise gin pole, attach to 4th section
- prep antenna for mast separation

12PM lunch 1PM

- support antenna mast
- separate and drop antenna
- drop antenna mast

- prep for 5th section for drop
- cut top guy wires at roof
- separate and drop 5th section

Saturday 4pm

Sunday 11AM

- connect guy ropes to top of 3rd section
- remove guy wires from dish and 4th section
- separate and drop dish

- move gin pole to 3rd section
- prep 4th section for drop
- separate and drop 4th section
- lift out and drop center mast

- support, disconnect, and separare electrical conduit
- lift out and drop electrical conduit

- move guy ropes to top of 2nd section
- move gin pole to 2nd section
- prep 3rd section for drop
- separate and drop 3rd section

- remove guy ropes
- move gin pole to 1st section
- prep 2nd section for drop
- separate and drop 2nd section

- raise and connect top section
- drop gin pole
- attach cellular booster

Sunday 2PM?




last updated 06/14/2024 at 19:34:11 by make_www_index.command version 2024.05.25.A