back to 2023.10.18 reconnected repaired control cable
5 final antenna check
5 final antenna check:
One last visual inspection of the tower and cables before we test it for full rotation.
2023.10.18 18.39.01:

2023.10.18 18.39.09:

highest resolution images
last updated 12/08/2023 at 18:37:35 by make_www_index.command version 2023.12.07.D