back to 2025.10.01 K0DV rotor swap

1 roof inspection 1 roof inspection:




I did a quick inspection of the guy wires before climbing the tower. One set did need a little tightening,
but the turnbuckle was already maxed, so the guy wire needed to be pulled in a little. All the roof anchors
were solid. The shingles also looked like they were getting near their replacement date.



  IMG_4483  
  IMG_4486  
  IMG_4487  
  IMG_4489  
  IMG_4492  
  IMG_4494  
  IMG_4483     IMG_4486     IMG_4487     IMG_4489     IMG_4492     IMG_4494  
  IMG_4495  
  IMG_4498  
  IMG_4495     IMG_4498  


highest resolution images
last updated 10/02/2025 at 16:02:02 by make_www_index.command version 2025.06.28.A